The Light Rail Transit 2 operation halts to a stop after catenary was struck by lightning , Monday morning. The cable that powers the LRT2 is currently being fixed.
RT@attycabs:lightning struck down the catenary line of Track No.3 at Santolan Stn reversing area thereby preventing any reversion operation
— PTV (@PTVph) August 13, 2012
repair of catenary system at Santolan Station on going, completion target is before 5 PM today.
— Hernando T. Cabrera (@attycabs) August 13, 2012
No comments:
Post a Comment